a-TroniX logo
a-TroniX logo
Accessories
AppCertificates
Configuration from A to Z
Control response timeController
Customer Specific
Devices
Boiler
Cloud
Energy Meter
Ev Charging Station
a-TroniXABBAlfenAlpitronicAmtronAutelBlitz-PowerEaseeEnovatesEtrelEVChargeKingFLEXeCHARGEGo-eHuawei SChargerIlumenKempowerMyEnergi EV Charging StationsNexBlueOCPPPeblar EV Charging StationsRaedianSchneider ElectricSiemensSMASofarTeltonika EV Charging StationsTriathlonVolt-TimeVoolWallbox EV Charging StationsXargeon / ZhongDe EnergyZaptec
Gas Meter
Heat Pump
New integrations
Plc
Pv Hybrid And Battery Inverters
Switched Loads
Water Meter
External Signals
InstallationLicenseNetworkQuick StartSafety, maintenance and legal noticesSpecificationsStatus LEDs
Troubleshooting
Wiring & connectivity guidelines
DevicesEv Charging Station

Go-e EV charger

Go-e

Supported Devices

Device TypeModbus TCP (Ethernet)RS485
Go-e EV charger✅❌

Configuration

  1. In the go-e application, go to your device, then "Settings".

  2. Go in the "Connection" tab.

Image 1
  1. Go in the "API Settings" tab.
Image 1
  1. Be sure that the "Allow local Modbus TCP API" and "Swap Registers" option are enabled.
Image 1
  1. Then reboot your go-e.
Image 1
Image 1
Last updated December 10, 2025Edit this page

FLEXeCHARGE

Previous Page

Huawei SCharger

Next Page

On this page

Go-e EV chargerSupported DevicesConfiguration